Where Quality Construction Begins

home
 
 

Projects MST has been awarded:

  • Illinois Department of Transportation (IDOT) Professional Transportation Bulletin 184 Item 3

    MST was part of the Team awarded the I-90 at I-290/Congress Parkway(Jane Byrne Interchange) EB Mainline Racine to Congress Parkway, Cook County, Region One/District One Phase III project.

    This project involves the improvement of I-90 at I-290/ Congress Parkway EB Mainline – Racine to Congress Parkway. The work for this project, includes but is not limited to, the construction of three new concrete retaining walls along I-290, EB mainline at Morgan, Peoria and Halsted Streets, the rehabilitation of two existing retaining walls and the removal and replacement of I-290 mainline eastbound pavement from Racine Street to Congress Parkway.

     

  • Illinois Department of Transportation (IDOT) Professional Transportation Bulletin 183 Item 4

    MST was part of the Team awarded the US 20 (Lake Street) at IL 59 (Sutton Road), Phase III project. This project is located in Cook County, Region One/District One.

    Phase III engineering is required to provide construction inspection services for the roadway reconstruction of US 59 north of US 20. Works includes but not limited to the construction of a new north-bound IL 59 to east-bound US 20 ramp, modification and improvement to the existing ramp junctions and medians, construction of a shared use path and sidewalk, and construction of retaining and noise walls.

     

  • Illinois Department of Transportation (IDOT) Professional Transportation Bulletin 180 Item 15

    MST was awarded IDOT’s PTB 180-015 to provide Materials Project Manager for Various Materials Inspections (PCC, HMA & Aggregate) Region Three, District Four.

    Phase III Engineering services are required for an Engineering Project Manager to manage and support various IDOT materials inspection processes throughout District Four. This work involves working directly with contractors, producers, supplier or local agencies and/or other consultants as needed. Materials acceptance responsibilities include sampling , testing and documentation of test results of various materials such as hot-mix asphalt (HMA), Portland cement concrete (PCC), aggregates, recycled asphalt pavement (RAP), recycled asphalt shingles (RAS), soils, pipe, precast and precast/prestressed concrete. Work for this project is expected to include plant and on-site inspections, sampling transportation of samples, testing at jobsite sand labs and documentation and data entry of test results.

     

  • Illinois State Toll Highway Authority (ISTHA) Professional Services Bulletin 17-3, Item 4

    MST was part of the team awarded the Tri-State Tollway Roadway Reconstruction, East West Connector MP 29.1 to Roosevelt Road MP 30.5. Phase II Engineering Services were required for the proposed roadway reconstruction and improvements as determined by the Tollway including reconstruction of the Tri State Tollway between 95th Street and Balmoral Avenue.

     

  • Illinois State Toll Highway Authority (ISTHA) Professional Services Bulletin 17-3, Item 17

    MST was part of the team awarded the Tri-State Tollway (I-94) Pavement and Structural Preservation and Rehabilitation MP 0.5 (Russell Road) to MP 25.2 (Lake Cook Road). MST was part of the Team awarded this project which is located in Lake County, IL.

     

  • Illinois State Toll Highway Authority (ISTHA) Professional Services Bulletin 17-3, Item 19

    Phase III engineering services are required for the construction inspection and supervision for the Reagan Memorial Tollway I-88 Roadway and Bridge Rehabilitation from IL 251 (MP 76.1) to Annie Glidden Road (MP 91.4). MST was part of the Team awarded this project which is located in Ogle and DeKalb Counties, IL.

     

  • Illinois State Toll Highway Authority (ISTHA) Professional Services Bulletin 17-3, Item 34

    MST was part of the team awarded the Tri-State Tollway construction inspection and supervision at selected locations on the Tollway system. Phase III engineering services for this project includes bridge rehabilitation including patching and joint repair on Tollway mainline bridges.

     

  • Illinois Department of Transportation (IDOT) Professional Transportation Bulletin 174-005

    MST was awarded IDOT’s PTB 174-005 to perform QA Testing on various aggregate, HMA and PCC projects for District One.

    Phase III Engineering services are required to perform QA Testing on various aggregate, HMA and PCC projects. Phase lll engineering services are required to perform quality assurance responsibilities of Hot-Mix Asphalt (HMA), Portland cement concrete (PCC) construction, Aggregate Gradation Control System (AGCS), pipe and pre-cast producers and pre-stressed and pre-cast producers. Responsibilities include Independent Assurance sampling and testing for PCC at both plants and jobsites. Additional responsibilities also include quality assurance inspection of pre-stressed and pre-cast producers at both plants and jobsites.

     

  • Illinois Department of Transportation (IDOT) Professional Transportation Bulletin 173-018

    MST was part of the team awarded the US 41 (Skokie Highway): I-94 (Tri-State Tollway) to IL 21, Phase III project C-91-008-15. This project is located in Lake County, Region One/District One.

    Phase III engineering is required to provide construction inspection services for the improvement of US 41. Work includes but is not limited to, pavement patching, milling and resurfacing the pavement from I-94 to IL 21.

     

  • Illinois Department of Transportation (IDOT) Professional Transportation Bulletin 173-019

    MST was part of the team awarded the US 41 (Skokie Highway) at IL 132 (under C&NW RR) Phase III project C-91-007-15. This project is located in Lake County, Region One/District One.

    Phase III engineering is required to provide construction inspection services for the improvement of US 41 at IL 132. Work on this project includes but is not limited to, intersection improvements, bridge replacement, retaining wall, and drainage improvements.

     

  • Illinois State Toll Highway Authority (ISTHA) Professional Services Bulletin 14-1 Item 1

    MST was part of the team awarded the Jane Addams Memorial Tollway (I-90), Roadway, Retaining Wall and Bridge Reconstruction and Widening project. The location of this contract is East of Oakton Street (MP 73.3) to East of Lee Street (MP 76.6).

    Phase III engineering services are required for the proposed roadway, retaining wall and bridge reconstruction and widening for ISTHA contract I-14-4186.

     

  • Illinois State Toll Highway Authority (ISTHA) Professional Services Bulletin 14-1 Item 6

    MST was part of the team awarded the Jane Addams Memorial Tollway (I-90), Roadway, Retaining Wall and Bridge Reconstruction and Widening project I-14-4191. The location of this contract is IL 25 (MP 56.8) to West of Higgins Road (MP 60.8)

    Phase III engineering services are required for the proposed roadway, retaining wall and bridge reconstruction and widening for ISTHA contract I-14-4191.

     

  • Illinois State Toll Highway Authority (ISTHA) Professional Services Bulletin 14-1 Item 14

    MST was part of the team awarded the Elgin O’Hare Western Access proposed construction of Wood Dale Road over the Elgin O’Hare Western Access project. The location of this contract is in DuPage County.

    Phase III engineering services are required for the proposed construction of Wood Dale Road over the Elgin O’Hare Western Access for ISTHA contract I-14-4637.

     

  • Illinois State Toll Highway Authority (ISTHA) Professional Services Bulletin 14-1 Item 17

    MST was part of the team awarded Materials Engineering Services Upon Request – Systemwide.

    Phase III engineering services are required for the Quality Assurance responsibilities of Hot-Mix Asphalt (HMA), Portland Cement Concrete (PCC), Aggregate Gradation Control System (AGCS) and Precast Materials in accordance with IDOT and Tollway Specifications.

     

  • Illinois Department of Transportation (IDOT) Transportation Bulletin 169 #13

    MST was awarded IDOT’s PTB 169 #13 to perform QA Testing on various aggregate and PCC projects. Phase lll engineering services are required to perform quality assurance responsibilities of Portland cement concrete (PCC) construction, Aggregate Gradation Control System (AGCS), pipe and pre-cast producers and pre-stressed and pre-cast producers. Responsibilities include Independent Assurance sampling and testing for PCC at both plants and jobsites. Additional responsibilities also include quality assurance inspection of pre-stressed and pre-cast producers at both plants and jobsites.

    This project includes Complete Quality Assurance Testing in accordance with The Standard Specifications for Road and Bridge Construction, Policy Memorandums 11-08.2 and 19-08.1 and any appropriate contract special provisions and plan notes or details.

  • Illinois Department of Transportation (IDOT) Transportation Bulletin 169 #4

    MST was part of the team awarded the US 6 (159th Street) from Will-Cook Road to West of US 45 (S. LaGrange Road), Cook County project.

    Phase lll engineering services are required to provide construction inspection services for the improvement of US 6 from Will Cook Road to West of US 45. This project includes the complete reconstruction and widening of the existing pavement, replacement of the drainage system and signage, the construction of a multi-use path and sidewalk on both sides of 159th St. and the replacement of four dry land bridges and two conventional bridges.

  • Illinois Department of Transportation (IDOT) Transportation Bulletin 169 #15

    MST was part of the team awarded the US 30 (Lincoln Highway) from IL Route 59 (Division Street) to I-55, Will County project.

    Phase III engineering are required to provide construction inspection services for the improvement of US 30 (Lincoln Highway) from IL Route 59 to I-55. This project involves but is not limited to the complete reconstruction of the existing pavement, lane additions and the re-decking of the US 30 Bridge over Lily Cache Creek.

  • Illinois State Toll and Highway Authority (ISTHA) Professional Services Bulletin 13-4 #8

    MST was part of the team awarded the Elgin O’Hare Western Access Advance Work Contracts, from I-290 to IL Route 83 in Cook and DuPage Counties.

    Phase III engineering services are required to perform on-site construction inspection, testing, documentation and other services as needed for the proposed advance work on the Elgin O’Hare Western Access Bridge Construction and Grading from Salt Creek to Lively Boulevard and Lively Boulevard to IL Route 83

  • Illinois State Toll and Highway Authority (ISTHA) Professional Services Bulletin 13-4 #14

    MST was part of the team awarded the Materials Engineering Services Upon Request, Systemwide

    Phase III engineering services are required for the quality assurance testing of hot-mix asphalt (HMA), Portland Cement Concrete (PCC), Aggregate Gradation Control System and Precast Materials in accordance with IDOT and Tollway Specifications.

  • Illinois Department of Transportation (lDOT) Bulletin 165 #1

    MST was part of the team awarded the Irving Park Road & Canadian Pacific Railroad Grade Separation project located at Irving Park Road and York Road in the Village of Bensenville.

    This project includes pavement reconstruction and widening, improved intersection geometry, additional auxiliary lanes, drainage system improvements and signal modernization. The most significant component of the improvement includes lowering Irving Park Road and raising the Canadian Pacific Railroad Bridge to provide an improved vertical clearance. The structure is proposed as a 131 foot single span bridge with closed abutments. Also included in this project is the construction of retaining walls along the raised railroad alignment, culverts to convey the relocated Bensenville Ditch, a 72 inch storm sewer to improve drainage and provide detention and the addition of turning lanes at the intersection.

  •  

  • Illinois Department of Transportation (lDOT) Bulletin 167 #4

    MST was part of the team awarded lDOT PTB#4 to perform construction inspection services for the improvement of US 12/45 (Mannheim Rd) IL 72 to I-190 (Kennedy Expressway).

    The improvements include the reconstruction and widening of 7,678 feet of Mannheim Road, reconstruction of approximately 1,065 feet of Higgins Road and modernization and interconnection of two signalized intersections along Mannheim Road at Zemke Boulevard and Higgins Road.

  •  

  • Illinois Department of Transportation (IDOT) Bulletin 163 #2

    MST was part of the team awarded the Route IL 59–Ferry Road to Auora Road project.

    The Route 59 expansion project will improve safety and traffic flow along the Route 59 corridor from Ferry Road to Aurora Road. The reconstruction involves widening Route 59 to three lanes in each direction, adding additional turn lanes and extending existing turn lanes along the three mile stretch. The project also includes the implementation of an innovative diverging diamond configuration on the bridge over interstate 88 that will also enhance safety and traffic flow.